|
Excavated materials.
|
23.—Any paving metalling or material excavated by the Commissioners in the construction of their works from any street may be applied by the Commissioners so far as may be necessary in or towards the reinstating of such street and the maintenance for six calendar months after the completion of the Tramways of so much of the carriage-way of such street as the Commissioners are by the provisions of this Act required to maintain, and the Commissioners shall, if required, deliver the surplus paving metalling or material not used or required to be retained as aforesaid to the borough surveyor on behalf of the Corporation, provided that if within forty-eight hours after notice in writing to such borough surveyor that the surplus of such paving metalling or material is ready for removal such surplus is not removed the same shall absolutely vest in and belong to the Commissioners and may be dealt with removed and disposed of by them in such manner as they shall think fit.
|