Notice of intention to erect building.
|
20.—(1) No person shall erect or construct or begin to erect or construct any building or structure of which any part is within or projects over or will, when such building or structure is completed, be within or project over the relevant area of any transmission wire unless he has, at least two months before beginning such erection or construction, given to the Board notice in writing stating his intention to erect or construct such building or structure and stating all relevant particulars of such building or structure.
|
| |
(3) In this section the expression “relevant area of any transmission wire” means the area within twenty-five yards on either side of the straight line joining the centres of the bases of any two consecutive posts, pillars, or other erections supporting such transmission wire, and the expression “transmission wire” means a wire or line carrying electricity above ground and forming part of the transmission system or of the distribution system.
|